Prototype demo. Admin / IoT experience — interactive demo data only.

voltswapp

Fleet & network overview

Illustrative telemetry from the intended IoT system

Docks reporting

8/10

Online in the last ping window

Low battery

3

At or below 20%

Open alerts

3

Avg battery health

90%

Managed docks

5

Rental & subscription — monitored and swapped by voltswapp

Purchased docks

1

Customer-owned — telemetry only, no swap service

Active subscriptions

3

Open swaps

3

Target turnaround 4h (pilot plan)

Intended IoT and dispatch loop

  1. Step 1

    Dock telemetry

    Charge, temperature, draw and health reported by the dock.

  2. Step 2

    Cloud ingest

    Readings stored per dock and per customer.

  3. Step 3

    Detection

    Low battery or anomaly crosses a threshold.

  4. Step 4

    Customer alert

    Customer is notified and can confirm a swap.

  5. Step 5

    Swap request

    Request enters the hub queue with priority.

  6. Step 6

    Hub availability

    Charged dock of matching capacity is reserved.

  7. Step 7

    Rider dispatch

    Rider verifies the dock and delivers it.

  8. Step 8

    Return leg

    Depleted dock returns to the hub for charging.

Shown as the intended design for the pilot. All readings on this page are demo data.

Dock telemetry

10 of 10 docks
DockOwnerChargeHealthTempDrawLinkLast ping
VS-DK-24813kWh · activeAmaka Nwosusubscription
18%
96%34°C620 W
online
VS-DK-11905kWh · activeBright Foodssubscription
62%
92%37°C1450 W
online
VS-DK-33202kWh · activeKola Adeyemirental
47%
89%33°C380 W
weak
VS-DK-41025kWh · activeZena Salonpurchase
78%
97%32°C2100 W
online
VS-DK-55101kWh · activeIbrahim Bellorental
9%
84%41°C210 W
online
VS-DK-60334kWh · activeNorthpoint Studiosubscription
55%
91%35°C980 W
offline
VS-DK-77203kWh · idleLekki Phase 1 Hubhub
100%
95%29°C0 W
online
VS-DK-77215kWh · chargingLekki Phase 1 Hubhub
64%
88%38°C0 W
online
VS-DK-88102kWh · maintenanceYaba Hubhub
12%
71%44°C0 W
online
VS-DK-88114kWh · idleYaba Hubhub
100%
93%28°C0 W
online

Alerts

  • low battery

    VS-DK-5510

    critical

    Battery at 9% — below 15% swap threshold

  • temperature

    VS-DK-8810

    warning

    Cell temperature 44°C during charge cycle

  • connectivity

    VS-DK-6033

    warning

    No telemetry received for 2h 06m

  • overload

    VS-DK-4102

    info

    Sustained draw 2.1kW near inverter limit

    Acknowledged
  • tamper

    VS-DK-3320

    warning

    Enclosure sensor triggered during transport

    Acknowledged

Energy delivered (demo week)

Hub capacity

  • Lekki Phase 1 Hub11 ready / 24 bays
  • Yaba Hub6 ready / 18 bays
  • Ikeja GRA Hub4 ready / 20 bays

Customer records (demo)

CustomerSegmentAreaDockPlanSinceStatus
Amaka NwosuhomeLekkiVS-DK-24813kWhsubscription2026-04-11
active
Bright Foods (SME)smeYabaVS-DK-11905kWhsubscription2026-03-02
active
Kola AdeyemihomeIkejaVS-DK-33202kWhrental2026-06-19
active
Zena SalonsmeSurulereVS-DK-41025kWhpurchase2026-01-27
active
Ibrahim BellohomeLekkiVS-DK-55101kWhrental2026-07-08
paused
Northpoint StudiosmeIkoyiVS-DK-60334kWhsubscription2026-05-14
active

Dispatch queue

RequestCustomerHubDock → replacementPriorityStatusRider
SW-5501Ibrahim BelloLekkiLekki Phase 1 HubVS-DK-5510VS-DK-77201kWh
high
queuedUnassigned
SW-5502Bright FoodsYabaYaba HubVS-DK-1190VS-DK-88115kWh
normal
assignedChika O.
SW-5503Kola AdeyemiIkejaIkeja GRA HubVS-DK-3320VS-DK-77212kWh
normal
in transitMusa I.
SW-5504Northpoint StudioIkoyiLekki Phase 1 HubVS-DK-6033VS-DK-88104kWh
normal
completedTunde A.

Assign riders from the hub operations view; changes appear here immediately.

Lagos pilot coverage

Map view placeholder

A live coverage map is planned for the pilot. Intended starting areas below.

  • Lekki Phase 1 Hub

    24 bays · 11 ready

  • Yaba Hub

    18 bays · 6 ready

  • Ikeja GRA Hub

    20 bays · 4 ready

Riders

  • Tunde A.

    RD-101 · Lekki Phase 1 Hub

    1 jobs
    on job
  • Chika O.

    RD-102 · Yaba Hub

    1 jobs
    available
  • Musa I.

    RD-103 · Ikeja GRA Hub

    1 jobs
    available
  • Ope F.

    RD-104 · Lekki Phase 1 Hub

    0 jobs
    off shift

Plans & pricing (pilot estimate)

DockCapacityRental / daySubscription / monthPurchase
voltswapp dock 1kWh1kWh₦2,500₦32,000₦480,000
voltswapp dock 2kWh2kWh₦4,200₦56,000₦850,000
voltswapp dock 3kWh3kWh₦5,800₦78,000₦1,200,000
voltswapp dock 4kWh4kWh₦7,400₦98,000₦1,550,000
voltswapp dock 5kWh5kWh₦9,000₦120,000₦1,900,000

Illustrative pilot estimates only — not a published price list.

Leads captured in this session

No leads yet. Submit the pilot, partner or demo form on the website and it appears here.

Session-only demo storage. Nothing is sent anywhere in this prototype.